A.4.2.9.4 Converters.
AFGS�87219B APPENDIX A
Compliance with the requirements of 3.2.9.4 shall be verified by analyses and tests as follows:
------------.
VERIFICATION RATIONALE (A.4.2.9.4)
System analyses, component qualification tests, and integrated EPS subsystem tests have proven to be required to verify converter performance.
VERIFICATION GUIDANCE (A.4.2.9.4)
a. Analyses appropriate for the converter installation include electrical load analyses, failure mode and effect analyses, hazard analyses, and reliability analyses.
b. Each converter should be qualification tested to its specification requirements.
c. The converters should be tested as components of the integrated EPS in mockup testing and after installation in the vehicle.
VERIFICATION LESSONS LEARNED (A.4.2.9.4)
Converters must be tested to demonstrate compliance with all of their performance requirements. This assures that the converters will operate in their actual environment. Every qualification test program results in some design changes that provide a better system in the field.
A.3.2.9.S Other.
Requirements for other major components are as follows: ------------.
REQUIREMENT RATIONALE (A.3.2.9.S)
Advanced EPS may include major components other than those described previously based on uniqueness of aircraft configuration. Requirements should be specified accordingly.
REQUIREMENT GUIDANCE (A.3.2.9.S)
Any unique requirement-such as permanent magnet generators (PMG)-should be specified here.
REQUIREMENT LESSONS LEARNED (A.3.2.9.S)
Most systems are unique and may require additional components. If they are needed, then adequate requirements must be specified to assure system operational compatibility.