AFGS�87219B
4.2.6 Auxiliary power.
Compliance with the requirements of 3.2.6 for EPS operation with on-board auxiliary power shall be verified by analyses and tests as follows: ------------.
4.2.7 Power distribution.
Compliance with the power distribution requirements of 3.2.7 shall be verified by analyses and tests as follows: ------------.
4.2.8 Control and protection.
Compliance with the EPS control and protection requirements of 3.2.8 shall be verified as follows: ------------.
4.2.9 Major components.
4.2.9.1 Aircraft wiring.
Compliance with the requirements of 3.2.9.1 for the design and installation of wiring shall be verified by inspection.
4.2.9.2 Batteries.
Compliance with the battery requirements of 3.2.9.2 shall be verified by analyses, tests, and inspection as follows: ------------.
4.2.9.3 Generators.
Compliance with the requirements of 3.2.9.3 shall be verified by analyses, tests, and inspection as follows: ------------.
4.2.9.4 Converters.
Compliance with the requirements of 3.2.9.4 shall be verified by analyses and tests as follows:
------------.
4.2.9.5 Other components.
The compliance of other components with the requirements of 3.2.9.5 shall be verified by
------------.
4.2.10 Environmental conditions.
The capability of the EPS and its components to perform as required under all specified environmental conditions shall be verified by analyses and tests as follows: ------------.
4.3 Electromagnetic interference.
Compliance with the electromagnetic interference requirements of 3.3 shall be verified by tests as follows: ------------.
4.4 Integrity.
Compliance with the integrity requirements of 3.4 shall be verified by analyses and tests as follows: ------------.
18
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business