AFGS�87219B
4.2.1 Electrical power characteristics.
EPS compliance with the requirements of 3.2.1 shall be verified by analyses and tests as follows:
------------.
4.2.2 Capacity.
The ability of the EPS to meet the capacity requirements of 3.2.1 shall be verified by analyses and tests as follows: ------------.
4.2.3 Uninterruptible power.
Compliance with the requirement for uninterruptible power shall be verified by analyses and tests as follows: ------------.
4.2.4 Emergency power.
a. The capability to supply all essential loads shall be determined by analyses and tests as follows: ------------.
b. Compliance with the load transfer requirements of 3.2.4.b shall be verified by analyses and tests as follows: ------------.
c. Compliance with the operational readiness requirements of 3.2.4.c shall be verified by analyses and tests as follows: ------------.
d. Compliance with other emergency power requirements shall be verified as follows:
------------.
4.2.5 External ground power.
a. The capability of the EPS to accept and distribute the maximum external power requirements while maintaining the required power quality shall be determined by analyses and tests as follows: ------------.
b. Protection of the aircraft against unsuitable external power shall be verified by analyses and tests as follows: ------------.
c. The required power transfer characteristics shall be verified by analyses and tests as follows: ------------.
d. Compliance with the design requirements for external power receptacles and their installation shall be determined by inspection.
e. Compliance with other external ground power requirements shall be as follows:
------------.
17
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business